Work begins on pre-fabricated house extension

February 9th, 2008 by Russell Curtis (russellcurtis)

Work has begun on our scheme for a striking house extension in Derby.

The scheme uses SIPs (structural insulated panels) to form a new, two-storey extension providing additional living space on the ground floor with a new bedroom above.
The SIP panels are being manufactured off site by SipBuild Limited (www.sipbuildltd.com) and will be brought to site on the back of a lorry to be assembled in a few days.