SIP Panel Extension – Site Progress, June 2008

June 18th, 2008 by Russell Curtis (russellcurtis)

Work is progressing on the two-storey SIP panel extension to a house on the outskirts of Derby. The external brickwork, comprising a random mix of different brick colours, is complete, and the windows are currently being installed.
The corner window, which can be seen in the photograph to the right, has a glazed corner, allowing views [...]

SIP panels erected for Derby residential project

April 9th, 2008 by Russell Curtis (russellcurtis)

Work has begun on erecting the SIP panels for our two-storey house extension in Derby.

Delivered to site in flat-pack form, the panels are erected within a few days on to a concrete slab – in this case, a beam and block floor. The grey sheeting to the outside of the panels is the breather membrane [...]

Work begins on pre-fabricated house extension

February 9th, 2008 by Russell Curtis (russellcurtis)

Work has begun on our scheme for a striking house extension in Derby.

The scheme uses SIPs (structural insulated panels) to form a new, two-storey extension providing additional living space on the ground floor with a new bedroom above.
The SIP panels are being manufactured off site by SipBuild Limited (www.sipbuildltd.com) and will be brought to site on the back of a lorry to be assembled in a few days.